Monday, October 30 – Saturday, November 4, 2017: Project Photos

Monday, October 30 – Saturday, November 4, 2017: Project Updates
(There is no work scheduled for Saturday, November 4th)

Monday October 30, 2017

  • No construction activities.

Tuesday October 31, 2017

  • No construction activities.

Wednesday November 1, 2017

  • No construction activities.

Thursday November 2, 2017

  • No construction activities.

Friday November 3, 2017

  • No construction activities.

Saturday November 4, 2017

  • No construction activities.

PLEASE NOTE:
Due to construction, there is no parking on Monroe Street from 7th – 8th Street NE for the period of 8/14/17 – 11/11/17.
NO PARKING signs have been posted. 

Signs directing motorist and bicyclist have been posted. Please stay alert and obey signage when traveling through this area.


Monday, October 23 – Saturday, October 28, 2017: Project Photos

Monday, October 23 – Saturday, October 28, 2017: Project Updates
(There is no work scheduled for Saturday, October 28th)

Monday October 23, 2017

  • No construction activities.

Tuesday October 24, 2017

  • No construction activities.

Wednesday October 25, 2017

  • No construction activities.

Thursday October 26, 2017

  • FMCC surveyors on site to continue baseline, bridge control line and street lighting manhole and conduit survey.

Friday October 27, 2017

  • FMCC surveyors on site to continue baseline, bridge control line and street lighting manhole and conduit survey.

Saturday October 28, 2017

  • No construction activities.

PLEASE NOTE:
Due to construction, there is no parking on Monroe Street from 7th – 8th Street NE for the period of 8/14/17 – 11/11/17.
NO PARKING signs have been posted. 

Signs directing motorist and bicyclist have been posted. Please stay alert and obey signage when traveling through this area.


Monday, October 16 – Saturday, October 21, 2017: Project Photos

Monday, October 16 – Saturday, October 21, 2017: Project Updates
(There is no work scheduled for Saturday, October 21st)

Monday October 16, 2017

  • Contractor worked at the west side of the intersection of 8th Street NE and Monroe Street NE, and east side of 9th Street and Monroe Street NE, backfilling, compacting installed 4-way PVC conduits, placed geo-fabric, reinforcement and poured 10’’ of concrete for utility cuts repair.

Tuesday October 17, 2017

  • Contractor worked at the south side of the intersection of 9th Street and Monroe Street NE, placement of 4’’ asphalt pavement for utility cuts repair, saw cut asphalt at the east of the intersection for conduits installation trenching.

Wednesday October 18, 2017

  • Contractor worked at the east side of the intersection of 9th Street NE and Monroe Street NE, excavating and installing manhole #25.

Thursday October 19, 2017

  • Contractor worked along Monroe Street NE from 8th Street to 10th Street, survey marking layout for manholes, utility cuts, and barriers locations.

Friday October 20, 2017

  • Contractor continued working along Monroe Street NE from 8th Street to 9th Street, survey marking layout for manholes, utility cuts, and bridge control lines.

Saturday October 21, 2017

  • No construction activities.

PLEASE NOTE:
Due to construction, there is no parking on Monroe Street from 7th – 8th Street NE for the period of 8/14/17 – 11/11/17.
NO PARKING signs have been posted. 

Signs directing motorist and bicyclist have been posted. Please stay alert and obey signage when traveling through this area.


Monday, October 9 – Saturday, October 14, 2017: Project Photos

Monday, October 9 – Saturday, October 14, 2017: Project Updates
(There is no work scheduled for Saturday, October 14th)

Monday October 9, 2017

  • No construction activities due to the rain.

Tuesday October 10, 2017

  • Contractor worked at the west side of the intersection of 8th Street NE and Monroe Street NE, backfilled, compacted installed fiber glass and PVC conduits, placed geo-fabric, reinforcement and poured 10’’ of concrete for utility cuts repair.

Wednesday October 11, 2017

  • Contractor worked at the west side of the intersection of 8th Street NE and Monroe Street NE, continued backfilling, compacting installed fiber glass conduits, placed geo-fabric, reinforcement and poured 10’’ of concrete for utility cuts repair.

Thursday October 12, 2017

  • Contractor worked at the east side of the intersection of 9th Street and Monroe Street NE, installed, encased with concrete 2-way PVC conduits; 4” of asphalt pavement for utility cuts repair.

Friday October 13, 2017

  • Contractor worked at the west side of the intersection of 8th Street and Monroe Street NE, continued installation of 2-way PVC conduits, 4’’ asphalt pavement for utility cuts repair.

Saturday October 14, 2017

  • Update: No construction activities.     

PLEASE NOTE:
Due to construction, there is no parking on Monroe Street from 7th – 8th Street NE for the period of 8/14/17 – 11/11/17.
NO PARKING signs have been posted. 

Signs directing motorist and bicyclist have been posted. Please stay alert and obey signage when traveling through this area.


Monday, October 2 – Saturday, October 7, 2017: Project Photos

Monday, October 2 – Saturday, October 7, 2017: Project Updates
(There is no work scheduled for Saturday, October 7th)

Monday October 2, 2017

  • Contractor FMCC worked at the west side of the intersection of 9th Street NE and Monroe Street backfilled, compacted installed fiberglass conduits with GAB, and placed temporary asphalt for utility cut repair.

Tuesday October 3, 2017

  • Contractor worked at the east side of the intersection of 9th Street NE and Monroe Street NE, backfilled, compacted installed PVC conduits, placed geo-fabric, reinforcement and poured 10’’ of concrete for utility cut repair.

Wednesday October 4, 2017

  • Contractor worked at the east side of the intersection of 9th Street NE and Monroe Street NE, excavating/trenching, installing, and encasement of 1-way and 2-way PVC.

Thursday October 5, 2017

  • Contractor worked at south side and east side of the intersection of 9th Street NE and Monroe Street NE, excavating, backfilling, compaction, placed geo-fabric, reinforcement and poured 10’’ of concrete for roadway restoration and for utility cut repair.
  • West side of the intersection of 8th Street and Monroe Street NE - installing 8-way fiberglass conduits.

Friday October 6, 2017

  • Contractor continued installation of 8-way fiberglass conduits at the west side of the intersection of 8th Street and Monroe Street NE.

Saturday October 7, 2017

  • No construction activities.

PLEASE NOTE:
Due to construction, there is no parking on Monroe Street from 7th – 8th Street NE for the period of 8/14/17 – 11/11/17.
NO PARKING signs have been posted. 

Signs directing motorist and bicyclist have been posted. Please stay alert and obey signage when traveling through this area.


Monday, September 25 – Saturday, September 30, 2017: Project Photos

Monday, September 25 – Saturday, September 30, 2017: Project Updates
(There is no work scheduled for Saturday, September 30th)

Monday September 25, 2017

  • Contractor FMCC worked at the west side of the intersection of 8th Street NE and Monroe Street, placed geotextile fabric, reinforcement and tie bars and poured 10” concrete for utility cut repair.

Tuesday September 26, 2017

  • Contractor worked at the intersection of 9th Street NE and Monroe Street NE, backfilling around the east vault manhole with GAB and placed temporary 12.5mm asphalt to restore the roadway.

Wednesday September 27, 2017

  • Contractor worked at the intersection of 9th Street NE and Monroe Street NE, excavating /trenching for 6-way fiberglass conduits.

Thursday September 28, 2017

  • Contractor worked east of  the intersection of 9th Street NE and Monroe Street NE, excavating and installing  2-way 4” PVC pipes.

Friday September 29, 2017

  • Contractor continued trenching and laying 2-way 4” PVC pipes east of the intersection of 9th Street NE and Monroe Street NE.
  • Contractor removed steel plates at the intersection of Monroe Street and 8th Street and placed 2” of temporary asphalt for utility cuts.

Saturday September 30, 2017

  • No construction activities.

PLEASE NOTE:
Due to construction, there is no parking on Monroe Street from 7th – 8th Street NE for the period of 8/14/17 – 11/11/17.
NO PARKING signs have been posted. 

Signs directing motorist and bicyclist have been posted. Please stay alert and obey signage when traveling through this area.


Monday, September 18 – Saturday, September 23, 2017: Project Photos

Monday, September 18 – Saturday, September 23, 2017: Project Updates
(There is no work scheduled for Saturday, September 23rd)

Monday September 18, 2017

  • Contractor continued trenching for fiberglass conduits west of the intersection of 8th Street NE and Monroe Street NE.
  • At east side: Intersection of 9th Street NE and Monroe Street NE, the contractor continued clean up.

Tuesday September 19, 2017

  • Contractor continued trenching for fiberglass conduits from the west vault manhole towards the split.
  • At east side: Intersection of 9th Street NE and Monroe Street NE, the contractor continued excavation for 12-way fiberglass conduits from the vault manhole to the split.

Wednesday September 20, 2017

  • Contractor continued trenching for fiberglass conduits from the west vault manhole towards the split; and laid and encased fiberglass.
  • At east side: Intersection of 9th Street NE and Monroe Street NE, the contractor continued excavation for 12-way fiberglass conduits from the vault manhole to the split.

Thursday September 21, 2017

  • Contractor encased the 12-way up to the split at the west side.
  • At east side: Contractor poured concrete to encase 5”, 12-way fiberglass conduits.

Friday September 22, 2017

  • Contractor backfilled trench cut for 12-way 5” fiberglass conduits at the intersection of 8th Street NE and Monroe Street NE, placed GAB and Geotextile fabric. Tie bars were drilled and bottom rebar placed. 10” PCC poured for roadway base restoration.

Saturday September 23, 2017
No construction activities.

PLEASE NOTE:
Due to construction, there is no parking on Monroe Street from 7th – 8th Street NE for the period of 8/14/17 – 11/11/17.
NO PARKING signs have been posted. 

Signs directing motorist and bicyclist have been posted. Please stay alert and obey signage when traveling through this area.


Monday, September 11 – Saturday, September 16, 2017: Project Photos

Monday, September 11 – Saturday, September 16, 2017: Project Updates
(There is no work scheduled for Saturday, September 16th)

Monday September 11, 2017  

  • Contractor continued trenching for fiberglass conduits at the intersection of Monroe ST NE and 9th Street.

Tuesday September 12, 2017

  • Contractor continued trenching for fiberglass conduits at the intersection of Monroe ST NE and 9th Street.

Wednesday September 13, 2017

  • Contractor continued placement of Pepco fiberglass conduits at the intersection of Monroe ST NE and 9th Street.

Thursday September 14, 2017

  • Contractor started the excavation on the West side to connect the West Pepco Vault manhole with the existing Vault manhole in the Bozzuto property west of 8th Street.

Friday September 15, 2017

  • Contractor continued trenching for fiberglass conduits West of the intersection of 8thStreet, NE and Monroe ST NE.

  • Contractor continued to excavate for the 2-way PVC at the intersection of 9th ST and Monroe ST NE.

Saturday September 16, 2017
No construction activities

PLEASE NOTE:
Due to construction, there is no parking on Monroe Street from 7th – 8th Street NE for the period of 8/14/17 – 11/11/17.
NO PARKING signs have been posted. 

Signs directing motorist and bicyclist have been posted. Please stay alert and obey signage when traveling through this area.


Monday, September 4 – Saturday, September 9, 2017: Project Photos

Monday, September 4 - Saturday, September 9, 2017: Project Updates
(Work is scheduled for Saturday, September 9th) 

Monday September 04, 2017
Labor Day – No construction activities

Tuesday September 05, 2017

  • Contractor continued trenching for fiberglass conduits at the intersection of Monroe Street NE and 9th Street NE. Because of underground utilities, work is being done by hand to go below water/sewer line present. Another unidentified pipe was found on 9th Street by the west curb. DC Water was called to identify the line. DC Water to come on Tuesday 9/5/2017.  

Wednesday September 06, 2017

  • Contractor continued trenching for fiberglass conduits at the intersection of Monroe Street NE and 9th Street NE and also west of the intersection of 8th Street NE and Monroe Street NE. Contractor used two crews (one at each end of the bridge). Contractor has installed 15ft of 6-way 5” fiberglass conduits at the intersection of 9th Street and Monroe – installation was done 9/5/2017
  • The MOT set up worked accordingly and each end had a flagger to direct traffic.
  • It started to rain at 11:30 AM. Contractor covered opened trenches with steel plates and suspended work around 12:30 PM.

Thursday September 07, 2017

  • Contractor continued trenching for fiberglass conduits at the intersection of Monroe Street NE and 9th Street NE and also west of the intersection of 8th Street NE and Monroe Street NE. Contractor used two crews (one at each end of the bridge). In addition to the civil crew, contractor had (1) electrical crew on 9th Street NE to continue excavation.

Friday September 08, 2017

  • Contractor continued trenching for fiberglass conduits at the intersection of Monroe Street NE and 9th Street NE and also west of the intersection of 8th Street NE and Monroe Street NE. Contractor used two crews (one at each end of the bridge). The electrical crew is working on 9th Street NE to continue excavation.

Saturday September 09, 2017

  • Contractor continued trenching for fiberglass conduits at the intersection of Monroe Street NE and 9th Street NE and also west of the intersection of 8th Street NE and Monroe Street NE.

PLEASE NOTE:
Due to construction, there is no parking on Monroe Street from 7th – 8th Street NE for the period of 8/14/17 – 11/11/17. NO PARKING signs have been posted. 

Signs directing motorist and bicyclist have been posted. Please stay alert and obey signage when traveling through this area.


Monday, August 28 – Saturday, September 2, 2017: Project Photos

Monday, August 28 – Saturday, September 2, 2017: Project Updates
(There is no work scheduled for Saturday, September 2nd)

Monday 8/28/2017

  • Contractor worked on riser forming work for the Vault manhole west of the intersection of Monroe Street and 8th Street NE.
  • Contractor continued trenching for fiberglass conduits to connect the east Pepco Vault at the intersection of Monroe Street and 9th Street NE.

Tuesday 8/29/2017

  • No construction activities due to rain.

Wednesday 8/30/2017

  • Contractor continued trenching for fiberglass conduits at the intersection of Monroe Street NE and 9th Street NE. Because of underground utilities, work is being done by hand to go below water/sewer line present.

Thursday 8/31/2017

  • Contractor FMCC continued trenching for fiberglass conduits at the east side of the bridge – Conduit will go from Pepco vault in 901 Monroe property to the newly placed manhole at the intersection of Monroe and 9th Street NE.

Friday 9/1/2017

  • Contractor FMCC continued trenching for fiberglass conduits at the east side of the bridge – to go under existing utilities, contractor is hand digging.

Saturday 9/2/2017

  • No construction activities.

PLEASE NOTE:
Due to construction, there is no parking on Monroe Street from 7th – 8th Street NE for the period of 8/14/17 – 11/11/17. NO PARKING signs have been posted. 

Signs directing motorist and bicyclist have been posted. Please stay alert and obey signage when traveling through this area.